欧美人一级淫片a免费播放-欧美人与z0z0xxxx-欧美人与zoxxxx视频-欧美人与动人物a级网站-91porn丨首页入口-91sao国产在线观看

Your present position:Home >> Use and Maintenance of Air-jet Loom
Use and Maintenance of Air-jet Loom
Time:[2019-8-7]    Pageview:7531

Use and maintenance of air-jet looms:

I. Periodic Maintenance

1.Daily maintenance and handling

Maintenance workers need to carry out routine maintenance of electric oil pump, centralized oil supply, heat dissipation part of main motor, input shaft of open cam box, electromagnetic brake, weft detector, scissors, winch, side brace and edge-trapping yarn.

2.Maintenance and disposal of machine time

Check whether the side brace ring rotates flexibly, whether it is worn, whether there are flying flowers, whether the interval between stop pin and main drum is 0.5 mm, whether the air pipe leaks, whether the centralized oil supply leaks, whether the oil pipe is damaged or bent, whether there are flying flowers in the control box, confirm whether the height error of the heald frame is less than 2 mm, and whether the air filter exhausts. Whether the pipe is unblocked, whether there are flying flowers on the pinion of the warp shaft, whether there is yarn head on the bevel gear shaft of the opening device, whether the screen hole on the oil filter is blocked, whether yarn head is rolled on the warp let-off and loosening axles, whether there is damage to the insulating sleeve of the wire and whether the clearance of the brake is correct. Fuel the nozzle, the gear face and chain of the open gear, and check whether the heald frame and the guide plate of the heald frame are worn or not.

3.Half-yearly overhaul and treatment

It is necessary to check whether the winding is clean, whether there are yarn marks and scars on the main drum and pin drum, whether the inside of the stop pin assembly is dirty, whether the open wire rope is elongated or damaged, whether the recovery spring is damaged, and whether the bearing of the open wire rope connecting seat is worn. Whether the belt tension is appropriate or not, whether there is damage, whether the sensors are working properly, whether the transmission gear box, coiling gear box and sending gear box are replaced with lubricating oil, whether the filter sieve is blocked, whether the reed is stained with dirt, whether the wind speed value is normal, and whether the U-shaped shaft lining of the pull-down hook is normal. Whether the wear is less than 2 mm, whether the main nozzle duct is bent, whether the coiling roller chain is elongated, whether the clearance between planetary gears is normal, whether the wear of the axle lining of the planetary tube seat is less than O.5 mm, whether the wear of the axle lining of the planetary tube is less than 0.5 mm, whether the wear of the axle lining of the planetary tube is less than O.5 mm, whether the auxiliary nozzle is scratched or not. There are yarn marks, whether bending or not, whether there is oil in the scissors device, and so on.

4.One-year overhaul and disposal

Whether the screw of the support foot of the main nozzle is loose or not, the screw should be tightened again.

5.Overhaul and disposal in two years

Whether the winding roll, pressing roll and rough rubber are worn, whether the warp and warp parts of the warp axle are worn within 0.3 mm, whether the buffer performance is reduced, whether the nylon bushing and the guide pin column of the buffer are worn, whether the auxiliary nozzle is dirty, whether the weft is cut correctly by the side shearing device of the yarn supply, whether the stop pin hole of the stop pin assembly is worn or not. Whether the wear of the roll shaft of the coiling cloth is less than 0.5 mm or not is less than 0.5 mm.

6.Overhaul and disposal in three years

Whether the lubricating oil of solenoid valve is insufficient and whether the coiling cloth roll rotates flexibly.

7.Seven-year overhaul

It includes the maintenance of bearings, oil seals, gears, cams, axle linings, stop pins, main motors, frame, opening, warp feeding, winding and weft storage parts.

二、Contents and Notices to be Preserved by Loom Institutions after Long-term Use

(1)Main transmission part: After long-term use of the loom, it is necessary to replace the oil seal of the crankshaft bearing seat of the driving part.

(2)Opening part: It is necessary to replace the cam open arm bearing, wire rope, heald spring and heald arm bearing.

(3)Replacement of synchronous toothed belt and cleaning of oil filter.

(4)Clean reed regularly.

(5)The inner parts of the length measuring and weft storage drum are replaced, the inner parts of the stop pin are replaced, and the encoder is cleaned.

(6)Main nozzle cleaning, filter cleaning, cleaning and repair of solenoid valve and pressure regulating valve, inspection and configuration of gas pipe.

(7)Servo motor maintenance and replacement, buffer repair and internal parts replacement.

(8)Check coiling brake rollers, chains, tensioning wheels, adjusting pins and replacement, maintenance and replacement of friction discs and discs. Inspection and replacement of rough rubber.

(9)Check and replace planetary gear, tube bearing, guide arm shaft and coupling.

(10)Inspection and replacement of weft detection cable

Previous: 暫無

Next: 噴氣織機:賣點在于低耗

主站蜘蛛池模板: 国产成人在线网址 | 噜噜爽| 国产美女久久 | 天天干天天曰天天操 | 日本暴力喉深到呕吐hd | 人人干人人干 | 亚洲免费mv | 日本污视频在线观看 | 成人理论片 | 亚洲va中文字幕 | 久草免费色站 | 久久精品网站免费观看 | 中国同志chinese小彬tv | 国产视频观看 | 中文字幕一二三四区2021 | 国产成人精品三级 | 五月激情久久 | 亚洲第一看片 | www.三级.com| 亚洲三级成人 | 亚洲精品私拍国产福利在线 | 国产稀缺精品盗摄盗拍 | 亚洲国产高清精品线久久 | 国产成人精品亚洲77美色 | 欧美午夜网 | 国产亚洲美女 | 男人天堂伊人网 | 永久免费mv网站入口 | 国产精品久久久久久久免费大片 | 天堂8在线天堂资源在线 | 看全色黄大色大片免费 | 国产高清免费在线观看 | 好大好紧好爽好湿润视频 | 六月婷婷啪啪 | 国产成人三级经典中文 | 在线www| 国产va | 天天看天天摸天天操 | 中文字幕v视界影院 | 日本xxxxbbbb| 天堂网|